Post-Tension Slab Sawing Protocols
Post-tensioned concrete slabs contain high-strength steel tendons tensioned to 30,000+ PSI. Saw operators must verify cable depth prior to joint cutting.
Direct Answer: Sawing pre-stressed and post-tensioned (PT) concrete slabs requires pre-cut non-destructive radar (GPR) scanning to locate high-tension steel cables, combined with laser-welded medium-soft bond diamond blades engineered for high-PSI concrete with embedded steel. Never saw into active PT cable anchor zones without structural engineering approval, as severed cables can snap violently out of slabs.
Post-tensioned concrete slabs contain high-strength steel tendons tensioned to 30,000+ PSI. Saw operators must verify cable depth prior to joint cutting.
A severed PT cable releases thousands of pounds of tension instantly, shooting out through the slab edge and risking severe injury or structural failure.